Traction Substation & HV Testing Guide

1. Purpose of Dry vs. Wet Withstand Tests

A power frequency withstand test verifies rather than measures: the insulator is subjected to a specified supply-frequency AC voltage held conventionally for one minute with no flashover and no puncture.

Railway OCS insulators qualified under GB/T 11030-2008 and the TB/T 3199 series are rated for service across −40 °C to +70 °C.

2. Pollution Sizing Basis

Current IEC TS 60815-1 specifies reference Unified Specific Creepage Distance (USCD) from approximately 22.0 to 53.7 mm/kV across site pollution severity classes a to e on a phase-to-earth basis—distinct from legacy IEC 815:1986 tables (16 to 31 mm/kV phase-to-phase).