Traction Substation & HV Testing Guide

1. Core Substation Equipment & Standards

Subsystem Representative Rating / Role Referenced Standards
Disconnectors 27.5 kV, 1250 A rated normal current on copper alloy contacts GB/T 1985-2023, TB/T 2803-2003
Vacuum Circuit Breakers Fault interruption and feeder zone switching GB/T 1984, GB/T 11022
Metal-Oxide Surge Arresters Y5WT-42/120 class with 5 kA discharge class GB/T 11032
Earthing & Touch Voltage 60 V rms AC normal prospective touch voltage limit EN 50122-1 / IEC 62128-1:2013

2. Feeding Architecture Options

The single-line diagram depends on feeding choice: plain 25 kV AC systems feed directly between catenary and rail, whereas 2×25 kV autotransformer (AT) systems deliver 50 kV between catenary and negative feeder with autotransformers installed every 10 to 15 km. DC railways instead deploy rectifier substations at closer intervals.